694 880 2743 info@makeitsmart.gr Mon–Fri 09:00–17:00 Plakias · Rethymno · Crete Get a quote
MEP design

Electromechanical studies

Every building over 50 m² needs a set of electromechanical studies before a building permit is issued. MEP systems are the heart of a building and need careful design and faithful execution.

Electromechanical studies – make it smart 1Electromechanical studies – make it smart 2

What's included

  • Heating and domestic hot water
  • Electrical installations
  • Water supply and drainage
  • Thermal insulation (KENAK)
  • Central air conditioning, where required
  • Heating cost allocation
  • Passive and active fire protection, fire detection
  • Lifts, ventilation, pools, lighting

What you gain

Lower consumption

The building is designed from day one to use less energy.

Right materials

Equipment chosen to suit the use and the budget.

Cost control

You know in advance what construction will cost.

Fewer problems

Design and execution by the same team, with no gaps between them.

Questions about this service

When are MEP studies needed?

For every building over 50 m², before the building permit is issued.